YRB had dump truck and loader fixing the washed out path closest to the mountain, and an excavator sorting out the culvert issues further down.
AIM has graded up as far as 20km.
The Kettle River has already flooded in some places, and there is erosion. Still several feet lower than the catastrophic flooding of 2018.
No comments:
Post a Comment